After a few months of inactivity at the Viimsi pilot plant (Estonia), since the operation of the pilot plant had to be stopped due to the situation caused by the Covid-19, at the end of May it was restarted.

A check-up of the plant has been carried out, thus checking that it works correctly. Therefore, the pilot plant is again operational, removing radionuclides from drinking water.

Today the sampling in the filter is being carried out, thus continuing with the established sampling plan.

 

Filter material sample